Category

Our pages

Download on the App Store Download on the App Store Make4Fun Apps Make4fun for iPhone/iPad! More fun ...everywhere.

Chunnel Blunder

In 1990 the News of the World reported that the Chunnel project, which was already suffering from huge cost overruns, would face another big additional expense caused by a colossal engineering blunder. Apparently the two halves of the tunnel, being built simultaneously from the coasts of France and England, would miss each other by 14 feet. The error was attributed to the fact that French engineers had insisted on using metric specifications in their blueprints. The mistake would reportedly cost $14 billion to fix
Smart Move
[HOT VIDEO] Smart Move

story Information

Upload Date: 31/12/1969

Downloads: 892

Other Stories

Other Stories

Helping your father

1076 downloads

Out of beer

923 downloads

Operation Parallax

995 downloads

Funny short Q n A

1170 downloads